Membrane construction, 11m high illuminated pylon, southern roundabout, Feuchtwangen, Germany<br>The steel construction is twisted along its axis by 135° and fitted with an interior lighting system.

Membrane construction, 11m high illuminated pylon, southern roundabout, Feuchtwangen, Germany
The steel construction is twisted along its axis by 135° and fitted with an interior lighting system.

2006

Services performed:

Structural engineering, construction design, determination of form and fabric cut

Team:

A. Bodenseh, J. Beierbach

Contractor:

aeronautec GmbH, Seeon, Germany

Client:

Feuchtwangen municipality, Germany