Membrane construction, 11m high illuminated pylon, southern roundabout, Feuchtwangen, Germany
The steel construction is twisted along its axis by 135° and fitted with an interior lighting system.
2006
Services performed:
Structural engineering, construction design, determination of form and fabric cut
Team:
A. Bodenseh, J. Beierbach
Contractor:
aeronautec GmbH, Seeon, Germany
Client:
Feuchtwangen municipality, Germany